PROJECT TYPE: Construction Noise Monitoring
CLIENT: Kleinfelder/Metro
CONSTRUCTION YEAR: 2014 - Ongoing

CSDA is working with Kleinfelder/Metro as the acoustical engineer for the
construction of the Crenshaw Line. The scope includes review of the contractor’s RFIs and
submittals with respect to construction noise control, and review of noise monitoring
plans and reports. CSDA is working alongside the contractor’s acoustical engineer in
reducing construction noise to the adjacent sensitive receivers (e.g., residences).

The Crenshaw Line/LAX Connector Transit Project is an 8.5-mile light-rail line, with
eight stations, including Leimert Park and Hindry. The rail line will run between the
Expo Line on Exposition Blvd. and the Metro Green Line. It will consist of above-ground
(La Brea Ave./La Cienega Blvd. and 405 Freeway/Century Blvd.) and tunneled
segments (Exposition Blvd. to 48th St/59th Pl to 67th St/Los Angeles International
Airport South Runways) with all remaining areas at ground level.